Subject: Observatory power

From: Mark Klaene

Submitted: Fri, 5 Aug 2005 10:47:06 -0600

Message number: 920 (previous: 919, next: 921 up: Index)

We are in the process of the UPS switch over for the main Operations 
Bldg. Power will be on and off through much of the day. Outside 
connections will likely be loss at times, this includes network and 
phones.

We expect to be completed by 1800 hrs MDT today with the disruptions.


-- 
Mark Klaene
Deputy Site Manager					voice: 505 437 6822
PO Box 59 						fax:   505 434 5555
2001 Apache Point Rd
Sunspot NM 88349-0059					web: www.apo.nmsu.edu


APO APO APO APO APO  Apache Point Observatory 3.5m  APO APO APO
APO
APO  This is message 920 in the apo35-general archive. You can find
APO  the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html
APO  To join/leave the list, send mail to apo35-request@astro.princeton.edu
APO  To post a message, mail it to apo35-general@astro.princeton.edu
APO
APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO