The APO 3.5m engineering shutdown for automation of tertiary rotation was successfully concluded on the night of May 7. Scheduled science operations resume on the night of May 8. It is now possible to redirect light from one instrument port to another in less than 60 seconds! Jeff Morgan and many other members of the telescope's engineering and operations staff have put together an very impressive system which will greatly speed instrument changes. Ed Turner APO APO APO APO APO Apache Point Observatory 3.5m APO APO APO APO APO This is message 348 in the apo35-general archive. You can find APO the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html APO To join/leave the list, send mail to apo35-request@astro.princeton.edu APO To post a message, mail it to apo35-general@astro.princeton.edu APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO