Subject: APO 3.5m Shutdown finished
From: elt@astro.Princeton.EDU
Submitted: Sat, 8 May 1999 08:00:13 -0400 (EDT)
Message number: 348
(previous: 347,
next: 349
up: Index)
The APO 3.5m engineering shutdown for automation of tertiary rotation
was successfully concluded on the night of May 7. Scheduled science
operations resume on the night of May 8.
It is now possible to redirect light from one instrument port to another
in less than 60 seconds! Jeff Morgan and many other members of the
telescope's engineering and operations staff have put together an very
impressive system which will greatly speed instrument changes.
Ed Turner
APO APO APO APO APO Apache Point Observatory 3.5m APO APO APO
APO
APO This is message 348 in the apo35-general archive. You can find
APO the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html
APO To join/leave the list, send mail to apo35-request@astro.princeton.edu
APO To post a message, mail it to apo35-general@astro.princeton.edu
APO
APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO