Due to previously announced circumstances (see apo35-general archive message #366 for details), the long term engineering shutdown originally scheduled to start on Aug. 16 will instead begin on Aug. 9, one week early. All science operations for the week of Aug. 9-15, inclusive, are therefore canceled. The final scheduled night of this shutdown remains Sept. 12 (with science operations set to begin on the night of Sept. 13). It is hoped that this early start will have the desirable side effect of improving the chances that we can return to science operations on schedule. Institutional Schedulers and/or User Cmte. members, please help make sure that the PIs and observers of any of your programs affected by this schedule change are aware of it. A new schedule reflecting this change will be issued shortly. Ed Turner APO APO APO APO APO Apache Point Observatory 3.5m APO APO APO APO APO This is message 368 in the apo35-general archive. You can find APO the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html APO To join/leave the list, send mail to apo35-request@astro.princeton.edu APO To post a message, mail it to apo35-general@astro.princeton.edu APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO