Subject: 1Q2014 APO 3.5m schedule, initial version 12/7/2013
From: Suzanne Hawley
Submitted: Sat, 7 Dec 2013 11:35:42 -0800 (PST)
Message number: 1323
(previous: 1322,
next: 1324
up: Index)
ARC 3.5M SCHEDULE FOR 1st QUARTER 2014
S.Hawley, R.McMillan 12/07/2013
NOTES: ***PLEASE READ***
Except in cases where strong science drivers dictate otherwise
(a minority of cases), observing time has again been scheduled
in half night blocks.
There are 90 nights, or 180 half nights, in 1Q2014. Regular
engineering (EN01) time is scheduled for 4 nights (8 half
nights) and DD time consists of 7 half nights, leaving 165
half nights available for allocation by the institutions.
In addition to scheduled engineering time, science
observations may be pre-empted, sometimes on short notice, for
urgent engineering tasks. Such tasks include both work that
is required to safeguard observatory personnel or facilities
and that allows "hot pursuit" of some significant problem.
Please see links off of the APO home page (http://www.apo.nmsu.edu/)
for a web based interactive version of this schedule.
There are 6 halfs of unallocated DD02 time and 2 halfs of OPEN time
in the initial version of the Q1 2014 schedule.
-----
EN Note: No science observations scheduled during EN time.
-----
EN01 = EN01 Klae X W
Routine periodic engineering time.
-----
DD Note: Director's Discretionary Time
-----
DD01 = DD01 Erac D O (B400+R300)
DD02 = DD02 TBD TBD TBD
-----
CS Note: 2 half nights allocated from lease
-----
CS01 = CS01 Chri E R
-----
CU Note: 12.5% share
-----
CU01.S = CU01 True S R (SDSS)
CU01.N = CU01 True N R
CU02 = CU02 Come D R (B1200+R1200)
CU03 = CU03 Schn D R (high,custom slit)
CU04 = CU04 Dese SN R (SDSS)
CU05 = CU05 Ball T R
CU06 = CU06 Come D R (B1200)
CU07 = CU07 Brow GD R (B1200+R1200)
-----
GS Note: 4 half nights allocated from lease
-----
GS01 = GS01 Bent D O (B400+R300)
GS02 = GS02 Kuzi D R (B400+R300)
GS03 = GS03 Kuzi D R (B400+R300)
-----
IHEP Note: 40 half nights allocated from lease
-----
IH01 = IH01 Wang D R (B400+R300)
-----
JHU Note: 8% share
-----
JH01 = JH01 Zaka D R (B1200+R1200)
JH02 = JH02 Ries D R (B1200+R1200)
JH03 = JH03 Weav S R (R)
JH04 = JH04 Tsve E R
-----
NAPG Note: 7 half nights allocated from lease
-----
NA01 = NA01 Will DSPG O
NA02 = NA02 Kwit D R (B1200+R300)
NA03 = NA03 Gall D O (B400+R300)
NA04 = NA04 Bary ET R
-----
NMSU Note: 15.625% share
-----
NM01 = NM01 Chan S R (SDSS)
NM02 = NM02 Chan D R (high,custom slit)
NM03 = NM03 Gray E R
NM04 = NM04 McKa E R
NM05 = NM05 Gray E R
NM06 = NM06 Lee D R (B1200+R1200)
NM07 = NM07 Holtz D R (B400+R300)
NM08 = NM08 Bizy D R (B1200+R1200)
NM09 = NM09 Ule E R
NM10 = NM10 Pan E R
-----
OU Note: 1 half night allocated from lease
-----
OU01 = OU01 Leig TP R (BG40)
-----
PU Note: 15.625% share
-----
PU01 = PU01 Gree D R (B1200+R1200)
PU02 = PU02 Val SD R (custom,low)
PU03 = PU03 Kasl DT R (B400+R300)
PU04 = PU04 Prie D R (B400+R300)
PU05 = PU05 Bako E R
PU06 = PU06 Newm S R (SDSS+Ha)
-----
SU Note: 1 half night allocated from lease
-----
SU01 = PU01 Hugh S R (ugCR)
-----
UC Note: 17% share
-----
UC01 = UC01 Frie D R (B400+R300)
UC02 = UC02 Stra GD R (B400+R300)
UC03 = UC03 York EGD R
UC04 = UC04 Kent D R (B400+R300)
-----
UV Note: 6.25% share
-----
UV01 = UV01 Sara S R (SDSS)
UV02 = UV02 Choj E R
UV03 = UV03 Bori T R
UV04 = UV04 Schm D R (high, custom slit)
UV05 = UV05 Steir S R (SDSS+Ha)
UV06 = UV06 Thua D R (B400+R300)
UV07 = UV07 Skru T R
-----
UW Note: 25% share
-----
UW01 = UW01 Alsa D R (B400+R300)
UW02 = UW02 Muka P R (BG40)
UW03 = UW03 Szko D R (B1200+R1200)
UW04 = UW04 Szko P R (BG40)
UW05 = UW05 Hugh S R (ugCR)
UW06 = UW06 Hebb N R
UW07 = UW07 Erac D R (B1200+R1200)
UW08 = UW08 Murp A O
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
MOST PROGRAMS ARE SCHEDULED IN HALF NIGHT BLOCKS. THE FIRST
HALF OF EACH NIGHT EXTENDS FROM SUNSET UNTIL 0110 MDT OR 0010 MST.
THE SECOND HALF FOLLOWS UNTIL SUNRISE.
FIRST HALF IS INDICATED BELOW AS "A"; THE SECOND, AS "B".
THIS QUARTER TEN PROGRAMS USE NON-BLOCK SCHEDULING.
INSTRUMENT CHANGE TIMES ARE NOT INCLUDED BELOW BUT WILL BE INDICATED
IN THE SCHEDULE ISSUED FROM APO AND WILL BE SHARED BETWEEN ADJOINING
PROGRAMS AS USUAL.
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
01/1 A: UW01
B: IH01
01/2 A: UW01
B: CU06
01/3 A: UC01
B: IH01
01/4 A: UW08/UC03
B: NM06
01/5 A: NM09
B: IH01
01/6 A: UV04
B: NM08
01/7 A: UC03
B: IH01
01/8 A: UW08/PU03/PU04
B: OPEN
01/9 A: UV04
B: JH04
01/10 A: UC04
B: IH01
01/11 A: NM10
B: OPEN
01/12 A: UC04/UW08
B: UV03
01/13 A: UV02
B: IH01
01/14 A: CU04
B: CU04
01/15 A: EN01
B: EN01
01/16 A: DD02
B: IH01
01/17 A: DD02
B: UW06
01/18 A: PU02/PU04/UW08
B: IH01
01/19 A: NA04
B: UC03
01/20 A: JH04
B: IH01
01/21 A: NA02
B: NM04/UW08
01/22 A: UC01
B: IH01
01/23 A: CU07
B: IH01
01/24 A: UC01
B: DD02
01/25 A: CU07
B: IH01/UW08
01/26 A: GS03
B: UC03
01/27 A: OU01
B: IH01
01/28 A: PU05
B: NA03
01/29 A: UC03
B: IH01
01/30 A: UC02
B: NA03
01/31 A: JH02
B: NM07
02/1 A: DD02
B: UV05
02/2 A: UW08/PU03/PU04
B: IH01
02/3 A: UC02
B: GS02
02/4 A: DD01
B: IH01
02/5 A: UW03
B: NM07
02/6 A: CU03
B: IH01
02/7 A: UC03
B: UW07/IH01
02/8 A: NM02
B: UW07/UC03
02/9 A: UW08/PU03/UW08
B: UW07/IH01
02/10 A: UC03
B: UW07/UW06
02/11 A: JH04/UW07
B: IH01
02/12 A: EN01
B: EN01
02/13 A: CU03/JH01
B: IH01
02/14 A: PU02/IH01
B: IH01[00:10-03:08]/JH01/NM05
02/15 A: NM02
B: JH01/DD02
02/16 A: CS01/UW08
B: JH01/PU05
02/17 A: PU03/IH01
B: IH01[00:10-03:05]/JH01/NM05
02/18 A: CU03
B: JH01/UW05
02/19 A: CU04
B: NM04
02/20 A: IH01
B: UW06/UW08
02/21 A: GS02
B: UC03
02/22 A: IH01
B: UC02
02/23 A: JH03
B: JH03/UW08
02/24 A: IH01
B: UW05
02/25 A: CU01.S
B: UV06
02/26 A: IH01
B: CU06
02/27 A: UW02
B: UW02
02/28 A: IH01
B: PU06
03/1 A: UW02
B: UW02
03/2 A: UW02
B: UW02
03/3 A: IH01
B: UC03
03/4 A: UW08/PU03/PU04
B: UV01
03/5 A: IH01
B: PU06
03/6 A: CU01.N
B: UC02
03/7 A: UW08/IH01
B: UC02
03/8 A: NM01
B: NM01/PU04
03/9 A: NA01
B: CU01.N
03/10 A: NA01
B: UV07
03/11 A: IH01
B: UW05
03/12 A: NA01/UW08
B: CS01
03/13 A: EN01
B: EN01
03/14 A: EN01
B: EN01
03/15 A: IH01
B: CU02/DD02
03/16 A: IH01
B: PU04[01:10-03:32]/CU02/NM03
03/17 A: PU02/UW06
B: CU02/CU01.N
03/18 A: IH01
B: CU02/NM10
03/19 A: GS01
B: PU03/PU01/NM03
03/20 A: IH01
B: PU03/PU01/UW08
03/21 A: GS01
B: CU02/CS01
03/22 A: UW03
B: PU03/PU01/NM03
03/23 A: IH01
B: CU02/UW04
03/24 A: NM06
B: UW04/UW08
03/25 A: NM08
B: CU05
03/26 A: IH01
B: UW04
03/27 A: CU06
B: PU05
03/28 A: IH01
B: CU01.S
03/29 A: NM06
B: UW04
03/30 A: IH01
B: SU01
03/31 A: CU05
B: UW04
APO APO APO APO APO Apache Point Observatory 3.5m APO APO APO
APO
APO This is message 1323 in the apo35-general archive. You can find
APO the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html
APO To join/leave the list, send mail to apo35-request@astro.princeton.edu
APO To post a message, mail it to apo35-general@astro.princeton.edu
APO
APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO