Subject: Re: APO 3.5m -- DIS update and June users committee minutes

From: Don York

Submitted: Wed, 26 Jun 2013 12:20:07 -0500

Message number: 1315 (previous: 1314, next: 1316 up: Index)

Many thanks to all.
On Jun 26, 2013, at 11:47 AM, Suzanne Hawley wrote:

> 
> 
> As many of you know, and as described in the minutes below from the users committee meeting last week, DIS has been experiencing some issues so we took it offline for the past 10 days to investigate.  Thanks to excellent work by the APO staff, the instrument is now back in service and the problems appear to be largely resolved.  All DIS users for the next few weeks until shutdown are encouraged to examine their data closely and to send feedback to Suzanne, Russet and Bill (see cc line above for addresses).  We appreciate and depend on your help in monitoring data from all the instruments so that we can keep on top of any developing problems.
> 
> Thanks,
> Suzanne Hawley
> Director, ARC 3.5m Telescope
> Apache Point Observatory
> 
> 
> -------------------------------
> 
> 
> 
> 
> 		APO 3.5-m Users Committee Minutes, 6/17/13
> 
> Attending:  Suzanne Hawley, Mark Klaene, Scott Anderson, Michael Strauss, John Bally, Jon Holtzman, Mary Beth Kaiser, Remy Indebetouw, Bill Ketzeback, and Bruce Gillespie.
> 
> Absent:  Al Harper
> 
> **********************************
> 
> User feedback and comments from institutional representatives:
> 
>  o Washington (Scott Anderson) - Scott had nothing new to report.
> 
>  o Chicago (Al Harper) - no report.
> 
>  o New Mexico State (Jon Holtzman) - Jon mentioned that in his reductions of DIS data from Jan/Feb, wavelength calibrations show wings in the spectral lines.  Suzanne said that this was previously noted, discussed, and steps are underway to remove the scattered light that is due to contamination in the dewar.  But one issue here is timeliness of getting feedback when there are instrumental problems, and Jon and Suzanne both stressed the continuing need for timely data inspection and communication between the remote observers and observatory staff.
> 
>  o Princeton (Michael Strauss) - Michael had nothing new to report.
> 
>  o Colorado (John Bally) - John had nothing new to report.
> 
>  o Virginia (Remy Indebetouw) - Remy had nothing new to report.
> 
>  o Johns Hopkins (Mary Beth Kaiser) - Mary Beth said that Hal Weaver was thankful for getting his recent comet observations during DD time, down to 8 airmasses!
> 
> **********************************
> 
> 
> Discussion of telescope/instruments report:
> 
> Mark said that the hot and dry weather is abating, and we've seen clouds and a little moisture in the past weeks.  The main telescope issue has been occasional overheating of the drive amplifiers.  Agile is back in service, and is now working better but still not entirely robustly. SPIcam and TripleSpec are working fine, as is the echelle although the filter positioning software remains an issue.  The NIC-FPS ion pump was replaced.  As to the DIS red camera contamination, it was worked on last summer but it has since been determined that there may be a flaw in the design of its vacuum system -- we plan to warm the instrument this week and work on the problem.  Also under investigation is an increase in dark current seen in DIS data that correlates with the ambient temperature in the dome.
> 
> Suzanne said that the Users Committee members should inform their users about the problems with the DIS red camera (i.e., contamination, dark current), and consider switching to a blue-only science program until the problems are fixed if their DIS programs would be adversely affected by the red camera issues.  Jon asked if we could raise the temperature set point for the red camera to stabilize the dark current.  Mark said that the dark current at a higher set point would be unacceptable, and we can't drive the Cryotigers any colder.  Suzanne said that we will likely go into the dewar this summer; it would be helpful to talk with Jim Gunn and Jeff Morgan for some advice.
> 
> Mark Klaene's detailed report for the reporting period follows:
> 
>                *************************
> 
> 
> 	      3.5-m Telescope and Instruments Highlights
> 	                5/2/13 through 6/12/13
> 
> 0) Overview
> 
> Typical NM late spring weather, dry and hot, winds decreasing with a fair amount of dust which has affected observing to a small extent. Some localized cloud buildup and minor amounts of rainfall. Forest is in Stage II fire restrictions.
> 
> 1) Telescope
> 
> The telescope performance has been nominal this period.  We are seeing amplifier overheats on the az and alt axes due to the hot temperatuires. These have been infrequent and caused little disruption to observing, however are troubling.  Upgraded amplifiers are available and we are researching them along with ways of improving airflow to the amplifiers.
> 
> 
> 2) Instruments
> 
> Low S/N was reported by a DIS user on the red side. We discovered that the dark current is much higher than normal. We also verified condensate inside the dewar.  Other users did not report issues and were still able to use DIS, but we have recently found that the dark current is highly correlated with the ambient temperature, so the effect on users varies from night to night.  We juggled the June schedule and will take DIS offline next week to investigate further.
> 
> Agile was inoperable this period. The camera was not taking images using the external trigger source. It was sent back to Princeton Instruments at the request of Anjum Mukadam. P.I. was unable to reproduce the failure but did update software and fixed a vacuum leak and cooling issue. The camera is back at APO and operating correctly most of the time. It appears to have an intermittent failure mode that we are still trying to characterize.
> 
> SPIcam and TripleSpec operated nominally.
> 
> The echelle operated nominally, but the ecam filter wheel still fails when going from ND5 to ND1. This is a bug in the motor control software which has apparently been there since the instrument was delivered.  A permanent software fix is being investigated but for now avoid this movement.
> 
> NIC-FPS is operating in shared-risk observing mode due to occasional image corruption issue. NFS less than 9 is operational.  The ION pump failed completely and had to be replaced. No scheduled observing was affected.
> 
>                         ********************
> 
> 
> Summer shutdown and Q3 schedule update:
> 
> Suzanne said that we had earlier planned for two separate shorter shutdowns this summer.  However, there have been delays in developing the software for migrating the TCC to Unix, so the second shutdown has been cancelled, and the first shutdown will be extended an additional week. Thus, the shutdown will run from 15 July - 8 August.  The Q3 observing schedule has been replanned accordingly.  There are a few extra bright open nights; these will be assigned soon.
> 
> **********************************
> 
> 
> AAS meeting feedback:
> 
> At the recent AAS meeting in Indianapolis, Suzanne said that there was much discussion about mid-sized telescopes.  In particular, NOAO is leaving the WIYN consortium, so the WIYN consortium held a session on possible new collaborations and the future landscape in general for 4-meter-class telescopes, such as WIYN, ARC, Mayall, Steward, SOAR, Palomar, etc.  WIYN has separately asked if we would be interested in time sharing our telescope with them, and this is under active discussion. There followed an extended, and enthusiastic, discussion on time-sharing with various mid-sized telescopes.
> 
> **********************************
> 
> 
> ACTION ITEMS:
> 
> [open from previous meeting]:
> 
> ===> ACTION: Send new partner suggestions to Suzanne, Rene and Bruce.
> 
> 	Status:  Open, for as long as necessary.
> 
> ===> ACTION:  Find users to assist with instrument documentation.
> 
> 	Status:  Open.  "Volunteers" are still reviewing documentation for feedback.  Additional help welcome.
> 
> ===> ACTION:  Explore new instruments discussion with users.
> 
> 	Status:  Open.  No feedback yet.  Users Committee members should hold informal meetings with their institutional users.
> 
> [new from this meeting]:
> 
> 	none
> 
> **********************************
> 
> 
> Next meeting:  We will skip July since the telescope will be in shutdown. The next Users Committee phonecon will be on Monday 12 August at 8:30 AM Pacific Time.  The agenda and other materials will be sent to the committee members during the preceding week.
> 
> APO APO APO APO APO  Apache Point Observatory 3.5m  APO APO APO
> APO
> APO  This is message 1314 in the apo35-general archive. You can find
> APO  the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html
> APO  To join/leave the list, send mail to apo35-request@astro.princeton.edu
> APO  To post a message, mail it to apo35-general@astro.princeton.edu
> APO
> APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO



APO APO APO APO APO  Apache Point Observatory 3.5m  APO APO APO
APO
APO  This is message 1315 in the apo35-general archive. You can find
APO  the archive on http://www.astro.princeton.edu/APO/apo35-general/INDEX.html
APO  To join/leave the list, send mail to apo35-request@astro.princeton.edu
APO  To post a message, mail it to apo35-general@astro.princeton.edu
APO
APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO