The User's Committee asked that I put out a memo on this e-mail server
detailing our intention to commission the DSC as a facility-class
instrument. Tim McKay and I discussed the following list of things that
need to be completed before we consider the DSC "handed-over" and treated
like we do the DIS and GRIM2. It is understood that the DSC would in any
case remain the formal property of FNAL, and would be placed in the custody
of ARC under some kind of loan agreement:
o fix susceptibility to stray light
o fix noise problem in analog electronics
o inventory spare parts
o finish filter wheel box
o general cleanup of instrument electronics packaging
o configuration control of instrument s/w
o complete as-built engineering and user support documentation
o enable remote interface in Remark
o enable data compression
o acquire and document filters and filter adaptors
Also, it is understood that in order to complete these projects, ARC needs
to specify what functionality and capabilities it expects from the camera
(e.g., what read modes need to be supported, etc.).
If you have comments or additional items or details for this list, please
send them to me and/or put them on this mailer.
thanks
bg
APO APO APO APO APO Apache Point Observatory 3.5m APO APO APO
APO
APO This is message 41 in the apo35-dsc archive. You can find
APO the archive on http://astro.princeton.edu:82/apo35-dsc/INDEX.html
APO To join/leave the list, send mail to apo35-request@astro.princeton.edu
APO To post a message, mail it to apo35-dsc@astro.princeton.edu
APO
APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO APO